Versant Bellevue

Located across from East Main station and the new park covering the tunnel entry, Versant Bellevue sits within a growing transit network linking Bellevue and Seattle across Lake Washington.

CLIENT

High Street Residential

LOCATION

Bellevue, WA

Services

Architecture

certifications

Anticipating LEED Gold

COMPLETION

Anticipating 2028

FULL OVERVIEW

Set on a steep, midblock site, the building steps with the terrain to create outdoor spaces where daily life extends outside.

Terraces and south-facing views keep residents connected to light, landscape, and Mt. Rainier on a clear day. A central courtyard forms a shared green space woven into everyday routine, visible from surrounding homes and animated by movement. Along the edges, subtle pathways and a tucked-away drive keep the block open and easy to move through, creating midblock connections both north/south and east-west across the superblock.


 

All the info you’ll need

PROJECT OVERVIEW

  • Two connected buildings; 6-story and 8-story mixed-use development
  • 351 residential units
  • 393,040 GSF – 266,350 Rentable SF.
  • Mix of studio – three-bedroom units, with 71 units marked as affordable housing
  • Proximity to East Main light rail station

Contacts

Jeff Reibman
Principal in Charge

Versant Bellevue in the News

The Versant Bellevue Begins Construction
425 Bellevue
March 26, 2026